Getting around Bedford and out to the site
Kempston Hardwick station is a request stop on the Marston Vale line between Bedford and Bletchley, right beside the Universal site. How to plan around it.
Updated

Update, 20 October 2026
Bedford Today reports that The Branston Way near Bedford is now closed at Ladies Walk Viaduct for repair works, with maintenance also underway on The Branston Way in Kempston. Source: Bedford Today: Bridge now closed at The Branston Way near Bedford for repairs at Ladies Walk Viaduct.
Update, 6 October 2026
Bedford Borough Council has criticised East West Railway's revised car parking plans for the new Bedford station, describing the proposals as "unreliable". The council remains unconvinced by the latest designs put forward for the station's parking facilities. Source: Bedford Today: Bedford Borough Council remains unconvinced by ‘unreliable’ train station car parking plans.
Update, 6 October 2026
National Highways has announced that there will be two upcoming closures on the A428 between Black Cat and Caxton Gibbet. The closures are planned for the A428 Black Cat to Caxton Gibbet area. Source: Bedford Today: Two upcoming closures for Black Cat to Caxton Gibbet area.
Update, 5 October 2026
The East West Railway Company (EWR) has published revised plans for car parking at Bedford station, proposing over 900 spaces across three sites - including a six-storey car park on Ashburnham Road and surface parking off Ford End Road. Bedford Borough Council has raised concerns about the lack of traffic modelling data and is pressing EWR for their overall masterplan before any decisions are made. Source: Bedford Borough Council: East West Rail announces Bedford station car parking plans.
Update, 2 October 2026
East West Rail has revealed revised car parking proposals for Bedford station, agreeing on a total of 900 spaces. The plan would place about 70 per cent of the spaces on the east side of the station in a six‑storey multi‑storey car park and a surface lot on Ashburnham Road, with the remaining 30 per cent in a surface car park off Ford End Road. The design also includes the potential for a community hub and a GP surgery on the ground floor, subject to further review. Source: East West Rail: East West Rail reveals new Bedford station car parking proposals.
Update, 1 October 2026
East West Rail has revealed new plans for a 900-space car park at Bedford Station, which could also include a community hub and GP surgery on the ground floor. Source: Bedford Today: East West Rail reveals new car parking plans for Bedford station.
Update, 30 September 2026
Bedford borough planners have recommended approval for a plan to build up to 93 homes in Bromham. The proposed development would occupy land earmarked for a railway linking Bedford and the Universal Studios theme park to Northampton and beyond, according to a transport group. Source: Bedford Today: Bromham housing plan recommended for approval by Bedford borough planners.
Update, 17 September 2026
The Black Cat upgrade has introduced overnight road closures. These closures will remain in place until Friday 18 September so that temporary barriers can be removed. Source: Bedford Today: More road closures until the end of the week as part of Black Cat upgrade.
Update, 17 September 2026
Councillors have given the thumbs up to the new Queen’s Bridge linking Bedford and Kempston, and the council’s planning committee has now approved planning permission for the bridge’s replacement. Source: Bedford Today: Councillors give new Queen's Bridge linking Bedford and Kempston the thumbs up.
The two stations, and why it matters
Bedford Midland is the big one — Thameslink to London St Pancras, plus services north. It is what most people mean by 'Bedford station'.
Bedford St Johns is a small, single-platform station a short walk from the town centre and from the Cauldwell area. It is on the Marston Vale line, and that line stops at Kempston Hardwick. If you are working at the resort site, St Johns is the station that matters and almost nobody tells you that.
The Marston Vale line
The line runs Bedford to Bletchley across the clay vale, calling at Bedford St Johns, Kempston Hardwick, Stewartby, Millbrook, Lidlington, Ridgmont, Aspley Guise, Woburn Sands, Bow Brickhill, Fenny Stratford and Bletchley.
It was built to serve the brickworks, which is precisely why it happens to run past a resort being built on those same brickfields. Kempston Hardwick and Millbrook are request stops — you signal the driver.
Worth knowing. Be realistic about it. This is a rural single-track line with a modest service that has had extended periods of rail replacement buses, and East West Rail works affect the corridor. Check what is actually running before you commit to a daily commute on it.
By road
The A421 is the artery — it runs past the site and links to the M1 at junction 13 to the west and towards the A1 to the east. Expect construction traffic on it to increase substantially over the next few years.
Bedford town centre itself is small and walkable. Parking is mostly paid, and the one-way system takes a couple of goes to learn.
Buses and cycling
Local buses cover the town and the larger villages, though rural evening and Sunday services are thin. Check the specific route before relying on it for a shift pattern.
Bedford is flat and has a decent riverside network — the traffic-free path along the Great Ouse towards Willington and Sandy is genuinely pleasant. Cycling from the south of town to the site is feasible for the reasonably fit.
Sources
Check these rather than taking our word for it.
- Bedford Today: Bridge now closed at The Branston Way near Bedford for repairs at Ladies Walk Viaduct
- Bedford Today: Bedford Borough Council remains unconvinced by ‘unreliable’ train station car parking plans
- Bedford Today: Two upcoming closures for Black Cat to Caxton Gibbet area
- Bedford Borough Council: East West Rail announces Bedford station car parking plans
- East West Rail: East West Rail reveals new Bedford station car parking proposals
- Bedford Today: East West Rail reveals new car parking plans for Bedford station
- Bedford Today: Bromham housing plan recommended for approval by Bedford borough planners
- Bedford Today: More road closures until the end of the week as part of Black Cat upgrade
- Bedford Today: Councillors give new Queen's Bridge linking Bedford and Kempston the thumbs up
- National Rail — live departures and service information
- East West Rail
This guide is general local information, not professional advice. We are independent and not connected to Universal. Costs and figures are indicative and change.
Common questions
- Is there a train station at the Universal Bedford site?
- Yes. Kempston Hardwick station is on the Marston Vale line between Bedford and Bletchley, right beside the site. It is a request stop, so you signal the driver to stop.
- Which Bedford station do I need for the Universal site?
- Bedford St Johns, not Bedford Midland. St Johns is on the Marston Vale line which stops at Kempston Hardwick. Midland is the main line to London.
- Is the Marston Vale line reliable?
- It has had significant disruption in recent years including extended rail replacement bus periods, and it is affected by East West Rail construction along the Bletchley to Bedford corridor. Check current services with National Rail before depending on it.
- How do I get to the Universal site by car?
- Via the A421, which runs directly past the site and connects to the M1 at junction 13. Expect construction traffic on that route to build considerably over the coming years.